Thursday, June 25, 2009

Electric passed inspection


Arlington Heights was here yesterday afternoon, and the electrical work has been approved. Good news.

The soffit area has been covered over with drywall, and the faux paint has been covered over with a special primer. Instead of sanding down the textured paint, the approach will be to primer the walls, then cover them with the same 'mud' used to tape the drywall. Less damage to the actual wall that way. Still a lot of sanding (and mess), to smooth out the 'mud' once it's dry.

Susan called yesterday. Due to a glitch in the design software, two of the cabinets were sized 4" too wide. They've been re-ordered, and the order will be expedited. Susan does not expect any impact to our schedule. I sure hope she is right.

Flooring is to be delivered today, and installed next Monday or Tuesday. That will be nice. Right now we're walking around on sub-flooring that has lots of sharp pointy bits sticking out, left over from the floor they ripped out. So we have to wear shoes. :-( We don't like wearing shoes, especially in the house.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.